More Articles
All Topics
Sunday, April 30, 2023

PLC 04: OFF Load on Counter 10 in LogixPro Simulator
Thursday, March 23, 2023

To ON the Load at Counter value 10 in LogixPro

If you cant understand how to use LogixPro then you can watch this video.
If you have any question then can ask to me in comments.
More topics:
Wednesday, March 8, 2023

Unlatching function in LogixPro Simulator
Sunday, January 3, 2021

PLC Course
A. A
Hi here i am after long time with new thing that is PLC Professional Course. Its very important for all Electrical, Electronics and for Mechanical technicians and Engineers equivalently.
In this course we are targeting PLC basic concepts, internal circuits and structures, DLD concepts, Ladder Language, simulation through LogixPro simulator
Here is course outline
If any want video course so please contact on
03455913812Email : 0101engr@gmail.com
or comment me
Monday, May 18, 2020

Ladder Logic of Exclusive Gates (XOR, XNOR) for PLC
Sunday, May 17, 2020

PLC Programming (Ladder Logic) for Logic Gates
Saturday, May 16, 2020

PLC Programming Thumb Rules
Here I am sharing thumb rules of PLC programming for Boolean algebra. As I discus earlier post that Ladder language is mostly use for PLC and Ladder is totally based on digital means Boolean algebra. In Boolean algebra basically there are four things are very important
- Non Complemented variables
- Complemented variables
- Plus (+) operator
- Dot (.) operator
Here I am telling that when you are drawing ladder then how to convert these logics. Mostly Boolean algebra consist on above four things.
1. Non Complemented Variables
When you fined Non Complemented Variables like A or B then mind it, you will use NO (Normally Open) switch in ladder logic. As you see under symbol.
2. Complemented Variable
And when you fined Complemented Variables like A` or B` then mind it, you will use NC (Normally Close) switch in ladder logic. As you see under symbol.
3. Plus (+) Operator (for OR logic)
And when you fined Plus (+) operator between two variables like A + B then mind it, you will use parallel switches according to variable conditions. As example

4. Dot (.) Operator (for AND logic)
And when you fined Dot (.) operator between
two variables like A . B then mind it, you will use switches in series path according
to variable conditions. As example

Wednesday, May 6, 2020

Programming Symbols of Ladder language for PLC
OUTPUT
This symbol is use for output (to ON or OFF the load) internally have SPST relay.
New Rung:
This symbol is use to add new rung in ladder.
Rung Branch:
This symbol is use to add parallel path (as sub branch) across any switch are branch in a one rung.
Latch:
Latch is output symbol to set or activate (set at ON) the load.
Unlatch:
Unlatch is use to reset or deactivate (to set at off) the load which is latched by latch (symbol) function.
more description and examples with be in next posts.
Tuesday, May 5, 2020

PLC Simulator LogixPro Free Download
LogixPro is very easy simulator for PLC Practicals for students and professional also. LogixPro is the Simulator designed y Allen Bradly PLC vendor for PLCs Programming in ladder language and also for programming.
LogixPro have some free simulators for training like
- IO simulator (Simple Inputs and Output panel)
- Door Simulator (like shutter door open and close)
- Silo Simulator (like refilling plant)
- Traffic Simulator (One way road crossing )
- Batch Simulator (like Mixer boiler Simulator)
- Dual Compressor Simulator
- Bottle line Simulator (Advance refilling plant)
- Elevator Simulator (for 4 floors)
and having simple functions
- Simple IOs functions (NC NO etc)
- Logic functions
- Arithmetic functions
- Timers
- Counters
for students version
Download Here:


























